Welcome to our online shop

Trusted Shops: Simply shop safely

We offer transparency and security with Trusted Shops

SKU: 20902002
5% off
New arrival

Crawford control unit for Crawford / Hafa loading bridge DLA | Gate & loading bridge

Sale price €926,90 Regular price €974,95
Tax included Shipping calculated at checkout.

Description

Crawford control unit for Crawford / Hafa loading bridge DLA

Central control unit for Crawford and Hafa loading docks. Suitable for the reliable coordination of the door and loading bridge. With integrated main switch for maximum operational safety in the loading area.

Product overview

The Crawford DLA control system is designed for loading docks where the door and loading bridge need to be securely locked together. It ensures clear processes, prevents operator errors, and increases safety during daily loading and unloading.

Safety and operating instructions: Control systems for combined loading systems are safety-relevant. Installation, connection, and commissioning must only be carried out by qualified personnel. Before maintenance work, the system must be de-energized via the main switch.

Technical data

Article number:
20902002
Compatibility:
Crawford / Hafa loading bridge DLA
Suitable for:
Gate and loading bridge
Main switch:
Yes, integrated
Gate manufacturer:
Crawford, Hafa
Weight:
1.5 kg
Unit:
Piece
Area of ​​application:
Industrial & Loading Technology

Advantages

  • Central control system for gate and loading bridge.
  • Suitable for Crawford and Hafa systems of type DLA.
  • Integrated main switch for safe maintenance work.
  • Prevents incorrect operation through clear locking logic.
  • Robust design for continuous industrial operation.

Application & Assembly

The control system is used in loading facilities where the gate and loading bridge must work together reliably. Especially in high-traffic areas, the DLA control system ensures safe and efficient processes.

  • Installation and connection only when the power is off.
  • After installation, check all safety and locking functions.
  • Perform regular maintenance according to operating conditions.
Important for occupational safety: Loading facilities with gates and loading bridges constitute a hazardous area. Operation and maintenance may only be carried out by trained specialists.

Practical example

A defective old control system was replaced at a logistics company. After the installation of the Crawford DLA control system, the gate and loading dock operated synchronously and reliably again, thus reducing downtime.

Frequently Asked Questions (FAQ)

For which systems is the DLA control system suitable?

For Crawford and Hafa loading facilities with gate and loading bridge.

Why is the main switch particularly important?

It enables the safe shutdown of all components during maintenance and increases workplace safety.

Can the control unit be installed by the user?

No, installation and commissioning must only be carried out by qualified specialists.

Is the controller suitable for continuous operation?

Yes, it is designed for industrial use with high turnover rates.

Crawford DLA control system - request a quote now

Do you need a safe and reliable control system for your loading facility? We offer expert advice and support with selection and commissioning.

Consultation & Offer

Delivery information

Shipping options | Costs & delivery times

Germany

- 5,90 € (1 - 8 working days)

- Order value from 300,00 € free of charge (1 - 8 working days)

- Garage doors free of charge (4-5 weeks)

Austria 

- 13,00 € (1 - 8 working days)

- Order value from 300,00 € free of charge (1 - 8 working days)

- Garage doors 90,00 € (4-5 weeks)

Luxembourg

- 13,00 € (1 - 8 working days)

- Order value from 300,00 € free of charge (1 - 8 working days)

- Garage doors free of charge (4-5 weeks)


Countries we ship to
Germany, Austria, Luxembourg*

*excluding islands

Delivery information for gates and doors

Pickup information:
Ordering and collection: Order online and collect the gate personally from our warehouse.

Delivery notice: The delivery notice provided by us after production is provisional and not legally binding. Deviations, e.g. due to traffic volumes or disruptions, do not give rise to claims for complaint.

Conditions for free freight of gates and doors:

-Please provide your mobile number when ordering
- Please ensure that someone is present to receive the goods on the scheduled delivery date. If someone is not present, please contact us.
- Our delivery is made with a truck combination of 18 meters in length.
- For unloading with a truck-mounted forklift we need sufficient space around the vehicle.
- Your address must be accessible; consider access roads, tight curves, posts, overhanging trees, etc.

Important points:
- The driver unloads the goods at the address specified when ordering.
- Unloading at other locations is the responsibility of the customer; we are not liable for damage at unsafely chosen unloading locations.
- If there are problems with space for unloading with the truck-mounted forklift, please ensure that there are enough unloading personnel available in advance.

Special cases:
- If your address cannot be reached by truck, please contact us before ordering to ensure optimal delivery and avoid damage.

If you have any further questions or special cases, please do not hesitate to contact us.

Which payment methods are accepted?

You can choose between the following payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • USDC
  • Visa

Prepayment by bank transfer, Shop Pay, Visa, Mastercard, American Express, Maestro, UnionPay, Apple Pay, Google Pay, EPS, Klarna invoice

Tormeister 24 Kundenstimmen: Vertrauen, Service & Erfahrung

Help & Advice

Do you have any further questions or need personal support? Our team will be happy to help.