Welcome to our online shop

Trusted Shops: Simply shop safely

We offer transparency and security with Trusted Shops

SKU: 5367

Pro-Line Light Grid GS-Pro Control Cable 6-pin | 5 m | CND1

Regular price €44,85
Tax included Shipping calculated at checkout.

Description

Pro-Line Light Grid GS-Pro Control Cable 6-pin – 5 m

Control cable for connecting Pro-Line GS-Pro light grids to the CND1 controller. For safe, stable and reliable signal transmission. in industrial gate systems.

Product overview

The Pro-Line GS-Pro control cable (6-pin, 5 m) connects the light grid directly with the gate control (CND1). It is specifically designed for industrial use. Designed for use and part of the safety-relevant connection between light grid and control system.

Safety & Occupational Safety:
Control cables for light curtains are safety-critical components. Use only suitable, system-compliant cables and connect them professionally.

Technical data

Article No.:
5367
Product type:
Control cable light grid
Drive type:
Pro-Line
Area of ​​application:
industry
Cable length:
5,000 mm
Number of cores:
6
Connection side A:
Light Curtain
Connection side B:
CND1
Weight:
0.14 kg

Advantages & Features

Direct control connection

Securely connects GS-Pro light grids to the CND1 controller.

6-pin version

Suitable for the secure transmission of all relevant signals.

Industrial quality

Robustly designed for continuous use on industrial doors.

Safety relevant

Part of the protection chain for personal and property protection.

Application & Assembly

The control cable is connected between the GS-Pro light grid and the Pro-Line CND1. The controller is connected. The correct assignment of the plug connections is... absolutely necessary.

  • Installation only in a stress-free state
  • Ensure all plug connections are fully and securely locked in place without tension.
  • Protect cables from tensile, kinking and crushing stress
  • Perform safety and functional tests after connection.
A notice:
Changes or cuts to the cable can affect signal quality and the Impair the safety function of the light grid.

Practical example

In an industrial gate system, the GS-Pro light grid was controlled via the 5-meter control cable. Connected directly to the CND1 controller. Result: stable signal transmission. and operation of the safety device in accordance with standards.

Frequently Asked Questions (FAQ)

What is the GS-Pro control cable used for?

For direct connection of the GS-Pro light grid to the Pro-Line CND1 control unit.

Is the cable relevant to safety?

Yes, it is part of the safety-relevant connection between the light curtain and the control system.

Is it permissible to shorten the cable?

This is not recommended, as it can impair signal quality and security.

Connect securely now

Do you need the right control cable for your Pro-Line GS-Pro light grid? We will advise you professionally and correctly – with a focus on safety and occupational safety.

Get in touch now

Delivery information

Shipping options | Costs & delivery times

Germany

- 5,90 € (1 - 8 working days)

- Order value from 300,00 € free of charge (1 - 8 working days)

- Garage doors free of charge (4-5 weeks)

Austria 

- 13,00 € (1 - 8 working days)

- Order value from 300,00 € free of charge (1 - 8 working days)

- Garage doors 90,00 € (4-5 weeks)

Luxembourg

- 13,00 € (1 - 8 working days)

- Order value from 300,00 € free of charge (1 - 8 working days)

- Garage doors free of charge (4-5 weeks)


Countries we ship to
Germany, Austria, Luxembourg*

*excluding islands

Delivery information for gates and doors

Pickup information:
Ordering and collection: Order online and collect the gate personally from our warehouse.

Delivery notice: The delivery notice provided by us after production is provisional and not legally binding. Deviations, e.g. due to traffic volumes or disruptions, do not give rise to claims for complaint.

Conditions for free freight of gates and doors:

-Please provide your mobile number when ordering
- Please ensure that someone is present to receive the goods on the scheduled delivery date. If someone is not present, please contact us.
- Our delivery is made with a truck combination of 18 meters in length.
- For unloading with a truck-mounted forklift we need sufficient space around the vehicle.
- Your address must be accessible; consider access roads, tight curves, posts, overhanging trees, etc.

Important points:
- The driver unloads the goods at the address specified when ordering.
- Unloading at other locations is the responsibility of the customer; we are not liable for damage at unsafely chosen unloading locations.
- If there are problems with space for unloading with the truck-mounted forklift, please ensure that there are enough unloading personnel available in advance.

Special cases:
- If your address cannot be reached by truck, please contact us before ordering to ensure optimal delivery and avoid damage.

If you have any further questions or special cases, please do not hesitate to contact us.

Which payment methods are accepted?

You can choose between the following payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • USDC
  • Visa

Prepayment by bank transfer, Shop Pay, Visa, Mastercard, American Express, Maestro, UnionPay, Apple Pay, Google Pay, EPS, Klarna invoice

Tormeister 24 Kundenstimmen: Vertrauen, Service & Erfahrung

Help & Advice

Do you have any further questions or need personal support? Our team will be happy to help.